ISO IEC 29110-4-1:2018 pdf free
ISO IEC 29110-4-1:2018 pdf free.Systems and software engineering一Lifecycle profiles for Very Small Entities (VSEs)
It has been found that VSEs find it difficult to relate ISO/IEC software related standards to their business needs and to justify the application of the standards to their business practices. Most VSEs can neither afford the resources, in terms of number of employees, budget and time, nor do they see a net benefit in establishing software life cycle processes. To rectify some of these difficulties, a set of guidelines and standards have been developed according to a set of VSE characteristics. The 29110 series of guidelines and standards are based on subsets of appropriate standards elements, referred to as VSE Profiles. The purpose of a VSE profile is to define a subset of ISO/IEC software related standards relevant to the VSE context, i.e., software processes and outcomes of ISO/IEC 12207.
This Annex presents the Process Reference Model for the VSE Basic Profile for software development.This Process Reference Model describes the software processes implied by this document at an abstract level. Each process of this process reference model is described in terms of a purpose and outcomes.It does not attempt to place the processes in any specific environment nor does it pre-determine any level of process capability required to achieve the requirements of this document. ISO/IEC TR 29110-3-1 describes the how conducting an assessment and the MF with the measurement scale for assessing process capability.
The PM process starts by using the customer’s statement of work to perform the basic project planning process. The PM project assessment and control tasks, compare the project progress against the project plan and actions are taken to eliminate deviations or incorporate changes to the project plan. Then,the PM project closure delivers the software configuration, produced by the SI process, and gets the customer ‘s acceptance to formalize the end of the project. A project repository is established to save the work products and to control its versions during the project.
The execution of the SI process is driven by the PM process. The SI process starts with an initiation activity of the project plan revision. The PM process will guide the execution of the software requirements analysis, software architectural and detailed design, software construction, software integration and test, and product delivery activities. To remove product’s defects, verification,validation and test tasks are included in the SI process activities workflow.ISO IEC 29110-4-1 pdf free.