Home>AS Standards>AS 1252.2:2016 pdf free

AS 1252.2:2016 pdf free

AS 1252.2:2016 pdf free.High-strength steel fastener assemblies for structural engineering一Bolts, nuts and washers
The term ‘verification testing’is used to describe the combination of the following:Selection, including the planning and preparation activities necessary to collect and produce the appropriate inputs in order to establish product conformity.
(b) Determination activities, including all types of methods and processes to be used to demonstrate compliance with the requirements of AS/NZS 1252.1, as outlined in this Standard.
(c) Review of the suitability, adequacy and effctiveness of the selction and determination activities described in Items (a) and (b) and the results of these activities with regard to fulfilment of the specified requirements.
(d) Decision regarding the outcome of the verification testing process, expressed in terms of product conformity as determined in accordance with this Standard.
(e) Attestation (issuing of a statement that fulfilment of the specified requirements has been demonstrated).
Determination activities shall be based upon a verification testing program undertaken by competent personnel. This verification testing program shall be carried out in accordance with the minimum sampling and testing plan outlined in Clause 2.3.3.3 under the sole responsibility of the supplier of the products before they are first placed into the market in Australia or New Zealand.
Verification testing shall only be performed on product that meets the requirements in AS/NZS 1252.1 for initial type testing (ITT) and factory production control (FPC),including factory production testing.
NOTE: Verification testing is only designed to confirm significant product characteristics for product from a stochastically controlled production process. Therefore, verification testing cannot be used to confirm product characteristics without documentation confirming ITT and FPC.
The party responsible for evaluating product conformity to this Standard shall establish that documentation is available comprising the following:
(a) Evidence of compliance with the requirements for ITT detailed in Paragraph B2 of Appendix B of AS/NZS 1252.1.
(b) Evidence of compliance with the requirements for FPC detailed in Paragraph B3 of Appendix B of AS/NZS 1252.1.
(c) Copies of procedures critical to maintaining product integrity, including testing procedures and nonconforming product procedures.AS 1252.2 pdf free download.

Related standards